Huong Thuong, largest river crossing bridge in Thai Nguyen

Nguyen Ngoc 11:36, 19/10/2023

Huong Thuong Bridge is the largest and most modern bridge in Thai Nguyen province, with a total investment of over 466 billion VND, designed as an Extradose cable-stayed bridge. After 2 years of construction (since September 2021), the project was completed and put into operation on October 19, coinciding with the 61st anniversary of the founding of Thai Nguyen City. 

Huong Thuong bridge acrosses Cau river. It connects Tuc Duyen ward, Thai Nguyen city with Huong Thuong commune, Dong Hy district. It is one part of the Dynamic Urban Integrated Development Project - Thai Nguyen City. 
Huong Thuong bridge acrosses Cau river. It connects Tuc Duyen ward, Thai Nguyen city with Huong Thuong commune, Dong Hy district. It is one part of the Dynamic Urban Integrated Development Project - Thai Nguyen City. 

 

The bridge has a length of 380 meters and a width of 23.5 meters.
The bridge has a length of 380 meters and a width of 23.5 meters.
It is designed as an Extradose cable-stayed bridge with a 100-year design life, constructed using reinforced and prestressed concrete.
The bridge is designed as an Extradose cable-stayed bridge with a 100-year design life, constructed using reinforced and prestressed concrete.
The bridge has four lanes for vehicles.
The bridge has four lanes for vehicles.
The bridges railing is made of rust-resistant steel, ensuring safety and aesthetics.
The bridge's railing is made of rust-resistant steel, ensuring safety and aesthetics.
 
 
Huong Thuong Bridge will contribute to the socio-economic development, providing a modern outlook for Thai Nguyen City and relieving traffic pressure on the existing Gia Bay Bridge, Ben Tuong Bridge, and Cao Ngan Bridge.
Huong Thuong Bridge will contribute to the socio-economic development, providing a modern outlook for Thai Nguyen City and relieving traffic pressure on the existing Gia Bay Bridge, Ben Tuong Bridge, and Cao Ngan Bridge.